Visual Materials
Big Creek Powerhouse #3
You might also be interested in

Big Creek Powerhouse #3 - Tunnel 3
Visual Materials
Big Creek Powerhouse #3 - Tunnel 3 - Steel reinforcing screen partially covered with gunite.
photCL SCE 02 - 30515

Big Creek - Powerhouse #3 (part 1)
Visual Materials
Big Creek - Powerhouse #3 (part 1) [first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.]
photCL SCE 13 - vol 032

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Portion of Project 3 Road construction between tunnel outlet (Camp 37), and the SJ&E RR junction (Camp 39) which was constructed in soil covered slopes.
photCL SCE 02 - 07945

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [Installing forms and reinforcing steel for foundation blocks at Dam 7]
photCL SCE 02 - 42278

Big Creek Powerhouse #4
Visual Materials
Big Creek Powerhouse #4 - Construction pictures taken by Dam & Tunnel office. [Installing forms and reinforcing steel for foundation blocks at Dam 7]
photCL SCE 02 - 42279

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Progress picture looking east from house 13. Steel forms for foundation concrete, house 12 being erected. 4" water and 6" sewer mains in trench along road.
photCL SCE 02 - 41618