Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

C1.3 - Maps - Drawing



You might also be interested in

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map of Big Creek development showing Powerhouses 1, 2&2A, 8, and 3.

    photCL SCE 02 - 13579

  • C1.3 - Maps - Drawing

    C1.3 - Maps - Drawing

    Visual Materials

    C1.3 - Maps - Drawing - "Pagett" Big Creek Project [includes several powerhouses that were never built]

    photCL SCE 02 - 10613

  • Big Creek PH#2

    Big Creek PH#2

    Visual Materials

    Big Creek PH#2 - Showing Camp #7 intake to PH #8 tunnel and forebay and Incline #2 bridge across Big Creek. The boom across the forebay was placed there to prevent any timbers, boards, ect., that might be released during PH #2A construction from going down either to the trash rack structure, or over the flashboards of Dam #5.

    photCL SCE 02 - 14809

  • Map of Big Creek No. 8 Development for Val. Dept

    Map of Big Creek No. 8 Development for Val. Dept

    Visual Materials

    Map of Big Creek No. 8 Development for Val. Dept. - includes location of Powerhouses 8, 2, & 2a, Dams 5 & 6, Tunnel 8, Camps 7, 31, 32, 33, & 42, penstock, transmission lines, roads and railroads.

    photCL SCE 02 - 16223

  • C1.3 - Maps

    C1.3 - Maps

    Visual Materials

    C1.3 - Maps - Map of Edison Transmission Lines and System for Annual Report. [drawing of Powerhouse 2 & 2A is shown as a mirror image]

    photCL SCE 02 - 16606

  • View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge

    View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge

    Visual Materials

    View of Big Creek Powerhouses #2 and 2A from across the forebay at waters edge.

    photCL SCE 05 - 54819