Big Creek, Florence Lake Dam



You might also be interested in

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Close-up of a cluster of blisters on the J-M Asbestile waterproofing on Arch 8. Waterproofing was applied May 1940.

    photCL SCE 02 - 24747

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Day's Work Joint Repair April 1940. Extensive chipping necessary on Arch #40. Joint elevation 7296, centerline to 12' left in order to remove disintegrated concrete. Average depth of chipping 3.5 to 4 inches.

    photCL SCE 02 - 22873

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Extrados of Arch No. 53. Upper portion has an experimental waterproofing coat of Barrett Waterworks Enamel reinforced with Osnaburg fabric. The second dark partion is the start of a raw linseed oil application over the remainder of the arch. The enamel was applied during November and December 1941.

    photCL SCE 02 - 24192

  • Big Creek, Florence Lake Dam - Close-up

    Big Creek, Florence Lake Dam - Close-up

    Visual Materials

    Big Creek, Florence Lake Dam - Close-up of open joint on Arch 9 at elevation 7296 from intrados side of Arch. Section of seam shown is from approximately centerline to 15' east..

    photCL SCE 02 - 22177

  • Big Creek, Florence Lake Dam

    Big Creek, Florence Lake Dam

    Visual Materials

    Big Creek, Florence Lake Dam - Method of waterproofing day's work joints on Arch 52, before guniting. 6" strips of asphalt impregnated felt was tacked to the arch between two applications of asbestile waterproofing.

    photCL SCE 02 - 24724

  • Big Creek, Huntington Lake Dams

    Big Creek, Huntington Lake Dams

    Visual Materials

    Big Creek, Huntington Lake Dams - Copy of Page 3 of Stone & Webster Report on Backfills on Dams at Huntington Lake: 4. Dam #1 - Badly disintegrated and porous concrete in vertical joint near station 5+66, elevation 690-4, after partial removal. Part of old repair plug in lower left center. 5. Dam #1 - Area near station 5+66, elevation 6904. Chipping in progress. Note two holes from which air escaped when applied to 4" drain through downstream backfill. 6. Dam #1. A second view of leak intakes near station 5+66, elevation 6904'. 7. Dam #1. Area near station 5+66, elevation 6904' after guniting.

    photCL SCE 02 - 21846