Borel Powerhouse - Borel Canal



You might also be interested in

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing gunite canal wall lining at approximate station 25+00 by Johnson-Western.

    photCL SCE 02 - 30542

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing 2" unreinforced concrete addition to floor slab.

    photCL SCE 02 - 30580

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Placing 1.5" thick concrete floor on section lined in 1937.

    photCL SCE 02 - 30561

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Break in canal lining.

    photCL SCE 02 - 25862

  • Borel Powerhouse - Borel

    Borel Powerhouse - Borel

    Visual Materials

    Borel Powerhouse - Borel - Placing concrete floor slab in cut-over canal

    photCL SCE 02 - 40199

  • Borel Powerhouse - Borel Canal

    Borel Powerhouse - Borel Canal

    Visual Materials

    Borel Powerhouse - Borel Canal - Raising lining about 0.7 foot on canal just above [Isabella] Auxiliary Dam.

    photCL SCE 02 - 30563