Visual Materials
Big Creek #1
You might also be interested in

Big Creek #1
Visual Materials
Big Creek #1 - Switchyard, excavation for tile drain.
photCL SCE 02 - 28310

Big Creek - Powerhouse #3 (part 2)
Visual Materials
Big Creek - Powerhouse #3 (part 2) [Generator floor with Units 1, 2, & 3 installed, excavation of Powerhouse 3 site with steam shovel and high pressure water gun, Switchyard construction, turbine parts, battery room, construction of penstocks, turbine assembly. Powerhouse #1 - penstock construction for Unit 3.]
photCL SCE 13 - vol 033

Big Creek, Vermilion Dam
Visual Materials
Big Creek, Vermilion Dam - Outlet Conduit excavation & water condition.
photCL SCE 02 - 44112

Big Creek Powerhouse #4 - Progress pictures (from Group 1)
Visual Materials
Big Creek Powerhouse #4 - Progress pictures (from Group 1) - Excavation for Powerhouse 4, outlet portal of power tunnel, and switchyard.
photCL SCE 02 - 40612