Visual Materials
Big Creek #1
You might also be interested in

Big Creek #1
Visual Materials
Big Creek #1 - Excavating with Drig. & feathers for upper anchor on penstock 3 rel..
photCL SCE 02 - 28421

Big Creek #1
Visual Materials
Big Creek #1 - Relocation of lower section of penstock.
photCL SCE 02 - 30138

Big Creek 2A - pipe fabrication
Visual Materials
Big Creek 2A - pipe fabrication (3651-A). Completed section of forged steel pipe with bolted flanged joints for Powerhouse 2A penstock. Largest sections were 66" inside diameter with 3" wall thickness, and 23 feet in length, weighing 27 tons. Picture taken in plant at Midvale Company.
photCL SCE 02 - 22943

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Section of pipe on landing near Anchor 3.
photCL SCE 02 - 09408

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Penstock 3 Vent Pipe from upper road.
photCL SCE 02 - 12064

Big Creek Powerhouse #1
Visual Materials
Big Creek Powerhouse #1 - proposed Line #3 Penstock relocation between Stations 4+04.17 and 9+42.97 (9+50.49). View of steep slope immediately below upper A.P. at Station 4+04.17. Man in picture standing at Angle Point. .
photCL SCE 02 - 26559C